Production Deployment
Move from an approved architecture or validated PoC into a governed production environment.
Match the engagement to the decision in front of you.
- 01
The architecture and material assumptions have been approved or validated.
- 02
A pilot, testnet, mainnet or migration programme needs accountable delivery ownership.
- 03
Production readiness depends on integrating controls, systems, monitoring and operating procedures.
- Programme owner
- Engineering
- Security and SRE
- Operations
- Control owners
Progress through explicit production gates
The route is staged so evidence, controls and operating readiness mature with the environment rather than being added after deployment.
- 01
Controlled pilot
Confirm the end-to-end workflow, roles and operating boundary with limited participants.
- 02
Testnet
Exercise integrations, monitoring, recovery, governance and operational acceptance.
- 03
Mainnet
Deploy the approved topology, policy, keys, evidence and production interfaces.
- 04
Production
Run against agreed service levels, control ownership, escalation and change procedures.
A tangible basis for the next institutional decision.
Gateway brings together the required infrastructure, privacy, identity, interoperability, integrations, monitoring and operating support across controlled pilot, testnet, mainnet and production stages.
- 01Production topology and deployment
- 02Integrated identity, privacy and interoperability controls
- 03Monitoring, evidence and incident paths
- 04Acceptance criteria and readiness record
- 05Operating runbook and responsibility model
- 06Release and transition plan
The target environment is deployed, accepted and supported with explicit ownership, evidence, recovery and change-control paths.
A route grounded in delivery.
Existing Gateway records retain their named, anonymized and pilot boundaries. No result is presented as a general benchmark.
100× throughput for a production zkEVM
Execution engineering applied to the production Polygon zkEVM sequencer.
Read the evidence →ProductionAn optimistic rollup before the OP Stack existed
Engineering and operation of the settlement chain behind Gnosis Pay.
Read the evidence →Pilot23,000+ TPS on customer premises
A high-throughput deployment validated inside the customer operating environment.
Read the evidence →A production-ready system designed around the institution’s governance, jurisdiction, security and operational requirements.
Exit criteria: The target environment is deployed, accepted and supported with explicit ownership, evidence, recovery and change-control paths.