GATEWAY
04 · Launch

Production Deployment

Move from an approved architecture or validated PoC into a governed production environment.

A production-ready system designed around the institution’s governance, jurisdiction, security and operational requirements.

Start here when

Match the engagement to the decision in front of you.

  1. 01

    The architecture and material assumptions have been approved or validated.

  2. 02

    A pilot, testnet, mainnet or migration programme needs accountable delivery ownership.

  3. 03

    Production readiness depends on integrating controls, systems, monitoring and operating procedures.

Typical working group
  • Programme owner
  • Engineering
  • Security and SRE
  • Operations
  • Control owners
Gateway's role

Progress through explicit production gates

The route is staged so evidence, controls and operating readiness mature with the environment rather than being added after deployment.

  1. 01

    Controlled pilot

    Confirm the end-to-end workflow, roles and operating boundary with limited participants.

  2. 02

    Testnet

    Exercise integrations, monitoring, recovery, governance and operational acceptance.

  3. 03

    Mainnet

    Deploy the approved topology, policy, keys, evidence and production interfaces.

  4. 04

    Production

    Run against agreed service levels, control ownership, escalation and change procedures.

What you receive

A tangible basis for the next institutional decision.

Gateway brings together the required infrastructure, privacy, identity, interoperability, integrations, monitoring and operating support across controlled pilot, testnet, mainnet and production stages.

  1. 01Production topology and deployment
  2. 02Integrated identity, privacy and interoperability controls
  3. 03Monitoring, evidence and incident paths
  4. 04Acceptance criteria and readiness record
  5. 05Operating runbook and responsibility model
  6. 06Release and transition plan
Exit criteria

The target environment is deployed, accepted and supported with explicit ownership, evidence, recovery and change-control paths.

Launch with Gateway

A production-ready system designed around the institution’s governance, jurisdiction, security and operational requirements.

Exit criteria: The target environment is deployed, accepted and supported with explicit ownership, evidence, recovery and change-control paths.